360新疆走势
- Introduction

Home > News

Lecron Energy Saving Materials Co., Ltd. successfully passed the OPCW on-site verification

Add time:2014-11-01 14:33:20 Browse number:

 

OPCW sent the inspection team to Lecron Energy Saving Materials Co., Ltd. to do on site verification about chemical facilities listed on the schedule II on Oct.13 to Oct.18, 2014. This is the first time for Lecron to be inspected by OPCW, and the fourth time for Shandong Province this year.
 
The chemical inspected is the Category II MCCs DMMP, mainly used to produce system polyol and polyurethane with flame resistance. The inspection team looked over the warehouse of raw material and finished products, the manufacturing shop, analysis Laboratory, machine repair shop, public works and other facilities.
360新疆走势
十一运夺金技巧算法 3d刺客彩票软件 两肖两码中特 河北时时彩 pk10怎么算冠军口诀 竞彩十四胜负彩 11选5免费计划软件 大乐透胆拖投注表金额 连环夺宝倍数图表 香港今晚开码结果查询 体彩p5开奖结果 福建体彩11选五走势图 时时彩走势图 湖北30选5几点开奖 ag手机娱乐平台